Kiwi aerospace company Rocket Lab has completed an internal review of data from its May 25 test flight of its Electron rocket.

The review found the launch had to be terminated due to an independent contractor’s ground equipment issue, rather than an issue with the rocket.

Rocket Lab’s investigation board has identified the root causes and corrective actions.

The Federal Aviation Administration, the primary body responsible for licensing the launch, has overseen Rocket Lab’s comprehensive investigation and will review the findings.

Rocket Lab’s engineers have spent the last two months working through an extensive fault tree analysis to ensure all factors that may have influenced the outcome of the launch were thoroughly evaluated.

Rocket Lab’s investigation team determined the launch, named ‘It’s a Test’, was terminated due to a data loss time out, which was caused by misconfiguration of telemetry equipment owned and operated by a third-party contractor who was supporting the launch from Rocket Lab’s Launch Complex 1.

Four minutes into the flight, at an altitude of 224 km, the equipment lost contact with the rocket temporarily and, according to standard operating procedures, range safety officials terminated the flight.

Data, including that from Rocket Lab’s own telemetry equipment, confirmed the rocket was following a nominal trajectory and the vehicle was performing as planned at the time of termination.

It was discovered a contractor failed to enable forward error correction on this third-party device causing extensive corruption of received position data.

The failure was first indicated by the fact that Rocket Lab’s own equipment did not suffer similar data loss during launch.

Further confirmation of the cause was demonstrated when replaying raw radio-frequency data - recorded on launch day - through correctly configured equipment also resolved the problem.

The fix for the issue is simple and corrective procedures have been put in place to prevent a similar issue in future.

No major changes to the Electron launch vehicle hardware have been required and the company has authorised the production of four additional launch vehicles as it prepares for commercial operations ahead of the test flight program.

Rocket Lab’s second Electron rocket, named ‘Still Testing’, is undergoing final checks and preparations ahead of being shipped to Rocket Lab Launch Complex 1 shortly.

“We have demonstrated Electron was following its nominal trajectory and was on course to reach orbit,” says Peter Beck, Rocket Lab CEO.

“While it was disappointing to see the flight terminated in essence due to an incorrect tick box, we can say we tested nearly everything, including the flight termination system.

“We were delighted with the amount of data we were able to collect during an exceptional first test launch.”

He adds that Rocket Lab’s telemetry systems provided data verifying Electron's capabilities and provided it with high confidence ahead of the second test flight.

“The call to terminate a launch would be tough for anyone, and we appreciated the professionalism of the flight safety officials involved,” Beck says.

The telemetry data loss that led to the termination of the flight has been directly linked to a key piece of equipment responsible for translating radio signals into data used by safety officials to track the vehicle performance.

The investigation involved the review of over 25,000 channels of data collected during the flight in addition to extensive testing at Rocket Lab facilities in California and New Zealand.

2019 threat landscape predictions - Proofpoint
Proofpoint researchers have looked ahead at the trends and events likely to shape the threat landscape in the year to come.
InternetNZ welcomes Govt's 99.8% broadband coverage plan
The additional coverage will roll out over the next four years as part of the Rural Broadband Initiative phase two/Mobile Black Spots Fund (RBI2/MBSF) programme expansion.
Commerce Commission report shows fibre is hot on the heels of copper
The report shows that as of 30 September 2018 there were 668,850 households and businesses connected to fibre, an increase of 45% from 2017.
Dr Ryan Ko steps down as head of Cybersecurity Researchers of Waikato
Dr Ko is off to Australia to become the University of Queensland’s UQ Cyber Security chair and director.
Businesses in APAC are ahead of the global digital transformation game
“And it’s more about people and culture - about change management - along with investing in the technology.”
HubSpot announces fund for 'customer first' startups
HubSpot is pouring US$30 million (NZ$40 million) into a new fund to support startups that demonstrate ‘customer first’ approach of not only growing bigger, but growing better.
Mac malware on WatchGuard’s top ten list for first time
The report is based on data from active WatchGuard Firebox unified threat management appliances and covers the major malware campaigns.
LearnCoach closes $1.5m seed round
The tutorials are designed for students who want to learn NCEA subjects but can’t make it to a physical classroom.